Savo's Site

Breath Sync / Nuit Blanche

Page Last Updated: January 17, 2026

Status: Complete

Period: August 2024 - October 2024

Client: Kara Springer Design via EDL

Tags: art EDL networking

Designed the electronics that powered an art installation for Toronto’s Nuit Blanche 2024 and beyond, synchronizing lights with the artist’s breathing rhythms

Vehicle Control Unit (VCU)

Page Last Updated: January 17, 2026

Status: For Sale

Period: November 2023 - June 2025

Client: Engineering Design Lab

Tags: EDL EV product design vehicles

Designed a general purpose control unit for small electric vehicles to accelerate their time to market as well as the supporting documentation

Remotely Operated Amphibious Electric Vehicle

Page Last Updated: January 17, 2026

Status: Complete

Period: November 2023 - February 2024

Client: The Canadian Department of National Defence via EDL

Tags: EDL EV

Led the coding and integration of a prototype amphibious electric vehicle for Arctic operation for the Canadian Armed Forces